News
		        Home  /  News   /  News from Naantali, Finland            
        
							20.11.2023                        
                        
														News from Naantali, Finland                        
					                    
																		News from Naantali, Finland                                
							                            Our recent accomplishment – a comprehensive 5-year survey of the 215,5 m-long INTERSEA TRAVELER container ship – is a testament to expertise, dedication and teamwork.
Steel renewal ✔ pipes renewal ✔ electric motors inspection and overhaul ✔ ME and AE overhaul ✔ propeller shaft withdrawal and inspection ✔ dismantling and installation of the propeller ✔ As the finishing touch, the entire vessel was thoroughly cleaned and a fresh coat of paint was applied.
							                        